Chalk lines should be snapped 33 5 8 above the eave line.
Roofing felt side up.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof.
Start the roof felt at one bottom corner of the roof.
Continue pulling the felt tight.
Item 656632 model 0903000.
After this lines should be snapped every 34 as you move up the roof.
The roofing felt should be applied in layers that overlap.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
The shed roof had a rip in the felt and was letting water in.
Attaching your roof felt 1.
When installing anything on a roof you need to follow the water rule the water rule means you consider where water will run when it s on the roof.
Part of the gaf lifetime roofing system feltbuster high traction synthetic roofing felt is covered by up to a lifetime limited warranty when installed on lifetime shingle roofs.
Tack the felt onto the initial rolling spot using a tack gun.
So the grey hard side is facing down.
Gaf shingle mate 36 in x 144 ft 400 sq ft felt roof underlayment.
So i brought some felt to recover it.
Return to the side that you began rolling from and.
Start rolling the first layer of felt out from the bottom of one side of the roof.
Its specially designed surface combines enhanced walk ability with a cooler working surface versus black asphalt felts.
I finished installing 30 roofing felt paper on my 10x12 shed but after reading around it seems i put the wrong side up meaning the lines that were marked on the felt are facing down instead of up.
Begin at the bottom right or.